It would output 990 MW from as many as 350 turbines. The developer has applied for permits and says they will put up to $1.5 billion into it.
Politics in the Zeros
Topple Trump, politics, renewable energy, water
Politics in the Zeros
Topple Trump, politics, renewable energy, water